Looking to apply for a LESCO new connection in 2025? Whether it’s for your home, office, or business, Lahore Electric Supply Company (LESCO) now offers a fully digital process for new electricity connections. This includes everything you need to know about the online application process, required documents, estimated costs, and how to track your connection status.
How to Apply for LESCO New Connection 2025 Online
Applying for a LESCO new electricity connection has become easier with the Electricity New Connection (ENC) system introduced by NEPRA and LESCO.
Step-by-Step Application Process:
- Visit the ENC Portal:
Go to www.enc.com.pk or www.lesco.gov.pk - Choose Your Connection Type:
Select Domestic, Commercial, or Industrial. - Fill Out the Online Form:
Provide CNIC, contact number, email address, and property details. - Upload Required Documents (list given below).
- Submit the Form:
After submission, a tracking ID will be generated. - Print and Sign the Application:
If requested, attach all documents and submit at the relevant LESCO office.
Read More: LESCO Issues Electricity Outage Timetable
Required Documents for LESCO New Meter Connection
Make sure all the following documents are ready before applying:
| Document | Details |
|---|---|
| CNIC Copy | Applicant’s CNIC (front and back) |
| Ownership Proof | Registry, Sale Deed, or Allotment Letter |
| Affidavit | Confirming no previous connection exists |
| Neighbor’s Bill Copy | Helps with load verification |
| Site Plan | Drawing showing meter installation location |
| Witness CNIC | Required in some specific cases |
LESCO New Connection Charges 2025 (Estimated)
Charges vary based on connection type and load capacity:
| Connection Type | Load Range | Estimated Fee (PKR) |
|---|---|---|
| Domestic | Up to 5 kW | Rs. 7,000 – Rs. 15,000 |
| Commercial | Up to 15 kW | Rs. 20,000 – Rs. 50,000 |
| Industrial | Above 15 kW | Charges depend on load & tariff |
Note: The final cost is determined after LESCO’s field survey and load assessment.
Track LESCO New Connection Status Online
You can easily monitor the progress of your LESCO new connection using your CNIC or tracking ID.
How to Track:
- Visit www.enc.com.pk
- Enter your Tracking ID or CNIC number
- Track your status through these stages:
Submitted → Survey Completed → Estimate Issued → Demand Notice Paid → Meter Installed
You may also send an SMS:
Type: LESCO <space> TrackingID and send to 8118
Read More: New LESCO Rules Offer Major Savings
LESCO Contact Information
For questions or issues related to your application:
- LESCO Helpline: 111-000-118
- Website: www.lesco.gov.pk
- Email: [email protected]
- Head Office Address: 22-A Queens Road, Lahore
Conclusion
Getting a LESCO new connection in 2025 is now straightforward and user-friendly thanks to the ENC online system. Make sure your documentation is complete and correct to avoid processing delays. Whether you’re setting up electricity for a home or commercial setup, following this guide ensures a smooth and efficient application process. Stay tuned with Bloom Pakistan



